|
|

Photos: (clockwise from top left) New Compressor
Air Filters and Piping, New Process Cooling Tower, Mixing
Bowl Piping and Pneumatic Conveyor Tubing, New Process Air
Blower with Inlet Filter and Silencer, Bulk Bag Transfer
Station
|
Colour Toner Plant Modifications
New Cooling Tower Study and Upgrade. Review of plant process
and HVAC loads on the existing cooling tower under new operating
parameters and for future expansion. This led to the need for a
second cooling tower, additional circulation pump and associated
piping, instrumentation and electrical upgrades.
Atkinson Engineering Inc. has carried out various engineering
projects related to the Colour Toner Plant process and services.
These include fabrication drawings for a stand-alone pressure vessel,
Mixing Bowl Retrofit, Bulk Bag Transfer Station, Clean in Place
Process Modifications, Blower Retrofit Study and Construction, Extruder
Material Handling Systems and Bulk Bag structural analysis.
|
|