Evaporator Unit Replacement

Photos: Evaporator/Ducting and Support Structure - East Elevation. inset: Evaporator/Ducting and Support Structure - West Elevation

Replacement of an existing Evaporator Unit with a new larger unit.

Two new structural steel platform levels were added over the existing steel braced structure to support the new evaporator unit and provide access. Various components of the existing structural steel braced structure were reinforced to resist the additional loading while other areas required rework to suit the new evaporator. Reinforcing of the piled foundations was required to resist the larger overturning forces.

A new stainless steel vapour duct was designed and routed to suit existing equipment, structures and pipe supports. All service piping, instrumentation and controls were added to the new evaporator as required to suit existing conditions while improving component access. Water and foam fire protection system was also added.

All work on this project was designed and detailed to be completed during a short plant shutdown period in a hot-work prohibitive environment.

 


786 King St. E. Hamilton Ontario L8M 1A6
Tel: (905) 523-1988 Fax: (905) 523-6221

E-Mail:
©Atkinson Engineering Inc. 2003, 2004, 2005