Conceptual Studies and Cost Estimates
Atkinson Engineering Inc. is often involved at the important conceptual
stage of project planning. We have helped with conceptual layouts, spatial
requirements, feasibility studies, use and occupancy checks, and cost
estimates.
Projects have included:
Aluminum Casting Plant - Conceptual design and cost estimate
for relocations for additional die-casting machines.
Lakehead University Cogeneration Building - Preliminary design
and cost estimating for building to house Cogeneration Plant.
Vegetable Oil Production - Review of various schemes to add
new grain preparation equipment with cost estimating.
Coil Coating Plant - Plant extension feasibility study and
cost estimate.
Vegetable Oil Production - Feasibility study and cost estimate
of building addition and relocations to install additional grain flaking
equipment line.
Steel Plant - Feasibility study on the relocation of the mobile
repair and heavy repair shops including costing of options.
Steel Cold Mill - Crane runway analysis and recommendations
for major upgrade.
Vegetable Oil Processing - Conceptual design and cost estimating
for process building addition.
Steel Plant - Feasibility study and cost estimate to relocate
and house a continuous strip annealing line.
Refractory Plant - Preliminary design and cost estimating of
a large mezzanine for storage.
Steel Plant - Conceptual design of facility to amalgamate all
plant painting forces including cost/benefit analysis.
|