Cold Mill Complex

Photos: (clockwise from top left): Cold Mill Building - Crane Runway Girder Erection, Indirect Gas-Fired Heaters in Truck Canopy, Pickle Line Building


New industrial building complex consisting of three crane runway buildings, two electrical and computer buildings, and four truck and equipment enclosures constructed at a cost of $30 Million. Engineering included design of buildings; crane runways; various heating, ventilation, and exhaust systems; building services; main process utility lines; and visitor and service walkways and stairs.

The new 60,000 sq. ft. Pickle Line building houses a 50 tonne crane. The 46,000 sq. ft. Cold Mill building houses a 100 tonne crane. The 90,000 sq. ft. Coil Storage building houses 2 - 50 tonne 156 ft. span cranes. The 105,000 sq. ft. Delivery Power House is a six-storey building housing the electrical and computer equipment for the exit end process. The Entry Power House is a four-storey building with a total floor area of 22,000 sq. ft.

The heating and ventilation systems include 17 indirect-fired natural gas door and make-up air heaters of 3,125 MBH each, 9 direct-fired natural gas make-up air units of 8,800 MBH each, 22 roof mounted exhaust fans for a total exhaust of 643,000 cfm, 12 make-up air fans for 360,000 cfm, 4,400 sq. ft. of roof gravity ventilators, and 5,000 sq. ft. of operable wall air-intake louvres.

Process services involved 10" high pressure superheated steam, 10" city water, 10" compressed air, 6" natural gas, and 36" cooling water supply and return.