Photos: (from top) Economizer, New Coil Tube Boilers.
|
Boiler Plant Upgrades
Atkinson Engineering Inc. projects related to the Central Boiler
Plant include the following:
- Expansion of Central Boiler Plant to accommodate two new 600
H.P. coil tube steam Boilers No. 4 and 5. Engineering included
building expansion and renovations; all services to boilers; modifications
to steam distribution; and relocation of degasifier, chemical
treatment system and diesel generator.
- Economizers for Boilers No. 2 and 3 were replaced to increase
the efficiency of preheating the make-up water. Modifications
were required to the stack, building roof structure, support system
and piping.
- An economizer and new stack was added to Boiler No. 1. Existing
stack support steel was modified to suit.
|
|