McMaster University -
Faculties Of Science And Engineering Expansion

Photos: (clockwise from top right): West Elevation and Link to A.N. Bourns Science Building, Centre for Electrophotonic Materials and Devices, Front Elevation, Conference Room

The expansion programme consisted of the following phases:

Addition to the John Hodgins Engineering Building

Four storey, 60,000 sq. ft. building housing research and teaching laboratories, classrooms, and offices. The laboratory facility contains over 32 fume hoods, laminar flow hoods, clean rooms, furnaces, extruders, reactors, and other laboratory equipment requiring controlled environment and local exhaust. All fume hoods include a variable volume fume hood exhaust system with variable frequency drives initiated by a sash position sensor. The laboratory controls are integrated with a main building variable air volume system incorporating variable speed control drives, air flow control valves, and air volume control terminals. The facility included ten different engineering and science departments and user groups each with specific space and utility requirements.

Renovations to the John Hodgins Engineering Building

Major renovations throughout an existing three-storey teaching and research building providing new laboratories, lounges, offices, and conference rooms. Project included new mechanical room penthouse and shaft-ways, air handling systems, and various utilities.


786 King St. E. Hamilton Ontario L8M 1A6
Tel: (905) 523-1988 Fax: (905) 523-6221

Click here to email us
©Atkinson Engineering Inc. 2003, 2004, 2005