Parking Structure Improvements


Atkinson Engineering Inc. has extensive experience with improvement and renovation projects on existing parking garage structures. Complete services include condition surveys of existing structures, development of repair procedures, construction cost estimating, traffic studies, evaluation of repair methods and materials, preparation of contract drawings and specifications, tender evaluations, construction monitoring and reviews and future maintenance cost forecasting. Work has been completed at the Victoria Avenue Garage for Hamilton General Hospital, the Concession Street and Poplar Avenue Garages for Henderson General Hospital, the Main Street Structure for McMaster University Medical Centre, and both parking structures at St. Joseph's Hospital.

Repairs have included:

  • Top side and underside delamination repairs
  • Beam and column delamination repairs
  • Through slab repairs
  • Concrete and masonry wall repairs
  • Waterproof floor traffic deck systems
  • Roof Membrane Systems
  • Stair repairs and replacements
  • Floor drain repairs and replacements
  • Drainage piping repairs and additions
  • Heat tracing and insulation replacements
  • Electrical conduit and wiring replacements
  • Snow melting systems
  • Energy efficient lighting improvements
  • Safety, security, and barrier-free upgrades